Forest Nanjing Airport Logistics Park

nanjing-airport.jpg

Prime, Established Logistics Location

Conveniently located in Nanjing Aviation Economic Development Zone and adjacent to Nanjing Lukou Airport and entrances of multiple expressways.

Excellent Specifications

The property was built to a very high specification with 2 premium-grade logistics facilities. It provides 9m clear heights and 92 loading bay, which allows for high operational efficiency.

STRATEGIC LOCATION

Forest Nanjing Airport Logistics Park
  • 11.0 km from Nanjing Lukou International Airport

  • 31.7 km from Nanjing South Railway Station

  • 35.0 km from Nanjing Downtown

  • 65.4 km from Nanjing North Railway Station

  • 72.5 km away from Nanjing Longtan Port

nanjing.jpg

PARTICULARS

  • 南1.jpg
  • 南2.jpg
  • 南3.jpg
  • 2022
    Q4

    Completed Date

  • 47,274
    sqm

    Total leasable area of approximately

  • 2,700
    sqm
    -4,500
    sqm

    Offer unit size ranging from

EXCELLENT SPECIFICATIONS

24/7 operations, Parking and Truck Parking, CCTV surveillance, ESFR sprinklers, Security

Building Structure

Double-storey ramp-access logistics facilities with concrete structure and steel roof truss

Fire Rating

Class C-II

Parking Space

188 vehicle parking spaces and 469 bicycle parking lots

Loading Bay

92 Loading Bay

Loading Platform

1.3m raised platform with hydraulic dock levelers

Clear Height

9m Clear Height

Floor Loading

1F : 3T/sqm : 2F : 2T/sqm

Floor Finish

Dust-free abrasion resistance flooring

Available Date

Completed in 2022 Q4

Class C ll Fire-Safety Grade

All buildings are fully equipped with automatic sprinkler, fire alarm systems, and both indoor and outdoor hydrant systems

Lighting Features

Facility Sorting Area : 250 lux
Facility Storage Area : 200 lux
c1_img.png
c1_bg01.svg

Building Structure

Double-storey ramp-access logistics facilities with concrete structure and steel roof truss

Fire Rating

Class C-II

Parking Space

188 vehicle parking spaces and 469 bicycle parking lots

Loading Bay

92 Loading Bay

Loading Platform

1.3m raised platform with hydraulic dock levelers

Clear Height

9m Clear Height

Floor Loading

1F : 3T/sqm : 2F : 2T/sqm

Floor Finish

Dust-free abrasion resistance flooring

Available Date

Completed in 2022 Q4

Class C ll Fire-Safety Grade

All buildings are fully equipped with automatic sprinkler, fire alarm systems, and both indoor and outdoor hydrant systems

Lighting Features

Facility Sorting Area : 250 lux
Facility Storage Area : 200 lux

The Line between Disorder and Order Lies in Logistics