Forest Chengdu Qingbaijiang Logistics Park

Chengdu.jpg

Prime, Established Logistics Location

Convenienlyt located in aviation zone and adjacent to   Chengdu Shuangliu International Airport and Qingbaijiang International Railway Port.

Excellent Specifications

The property was built to a very high specification with 2 premium-grade logistics facilities and one 5-storey integrated building. It provides 9m clear heights and 68 loading bay, which allows for high operational efficiency.

STRATEGIC LOCATION

Forest Chengdu Qingbaijiang Logistics Park
  • 42.3 km to Chengdu Shuangliu International Airport

  • 8 km to Qingbaijiang International Railway Port

  • 5.7 km to Chengyu Highway entrance

  • 5 km to Qingbaijiang East Railway Station

  • 27.4 km to Chengdu East Railway Station

  • 26.9 km to Chengdu Downtown

  • 14.8 km to Chengdu Beltway

成都.jpg

PARTICULARS

  • 成3.jpg
  • 成2.jpg
  • DING39781.jpg
  • 2020

    Completed in July

  • 96,698
    sqm

    Total leasable area

  • 3,740
    sqm
    -4,100
    sqm

    Offer unit size ranging from

EXCELLENT SPECIFICATIONS

24/7 operations, Parking and Truck Parking, CCTV surveillance, ESFR sprinklers, Security

Building Structure

Double-storey ramp-access logistics facilities with concrete structure and steel roof truss

Fire Rating

Class C-II

Parking Space

108 Parking

Loading Bay

68 Loading Bay

Loading Platform

1.3m raised platform with hydraulic dock levelers

Clear Height

9m Clear Height

Floor Loading

1F : 3T/sqm ; 2F : 2T/sqm

Floor Finish

Dust-free abrasion resistance flooring

Available Date

Completed in July 2020

Class C ll Fire-Safety Grade

All buildings are fully equipped with automatic sprinkler, fire alarm systems, and both indoor and outdoor hydrant systems

Lighting Features

Facility Sorting Area : 250 lux
Facility Storage Area : 200 lux
c1_img.png
c1_bg01.svg

Building Structure

Double-storey ramp-access logistics facilities with concrete structure and steel roof truss

Fire Rating

Class C-II

Parking Space

108 Parking

Loading Bay

68 Loading Bay

Loading Platform

1.3m raised platform with hydraulic dock levelers

Clear Height

9m Clear Height

Floor Loading

1F : 3T/sqm ; 2F : 2T/sqm

Floor Finish

Dust-free abrasion resistance flooring

Available Date

Completed in July 2020

Class C ll Fire-Safety Grade

All buildings are fully equipped with automatic sprinkler, fire alarm systems, and both indoor and outdoor hydrant systems

Lighting Features

Facility Sorting Area : 250 lux
Facility Storage Area : 200 lux

The Line between Disorder and Order Lies in Logistics