Forest Nanning Airport Logistics Park

nanning-xiaoguotu-A4.jpg

Prime, Established Logistics Location

Conveniently located in aviation zone and adjacent to Nanning Wuxu International Airport and entrances of multiple expressways.

Excellent Specifications

The property was built to a very high specification with 3 premium-grade logistics facilities. It provides 9m clear heights and 172 loading bay, which allows for high operational efficiency.

STRATEGIC LOCATION

Forest Nanning Airport Logistics Park
  • 0.8 km from Expressway G210

  • 3.0 km from Nanning–Youyiguan Expressway G7211

  • 5.5 km from Nanning Wuxu International Airport

  • 7.5 km from Airport 2nd Expressway

  • 9.4 km from Wuxu Railway Station

  • 34.0 km from Nanning Downtown

南宁.jpg

PARTICULARS

  • DLJR26991.jpg
  • DLJR25791.jpg
  • DLJR32041.jpg
  • 2023
    Q1

    Completed Date

  • 89,254
    sqm

    Total leasable area of approximately

  • 4,042
    sqm
    -6,451
    sqm

    Offer unit size ranging from

EXCELLENT SPECIFICATIONS

24/7 operations, Parking and Truck Parking, CCTV surveillance, ESFR sprinklers, Security

Building Structure

Double-storey ramp-access warehouse with concrete structure and steel roof truss

Fire Rating

Class C-II

Parking Space

59 car parking spaces and 10 truck parking spaces

Loading Bay

172 Loading Bay

Loading Platform

1.3m raised platform with hydraulic dock levelers

Clear Height

9m Clear Height

Floor Loading

1F : 3T/sqm ; 2F : 2T/sqm

Floor Finish

Dust-free abrasion resistance flooring

Available Date

Completed in 2023 Q1

Class C ll Fire-Safety Grade

All buildings are fully equipped with automatic sprinkler, fire alarm systems, and both indoor and outdoor hydrant systems

Lighting Features

Facility Sorting Area : 250 lux
Facility Storage Area : 200 lux
c1_img.png
c1_bg01.svg

Building Structure

Double-storey ramp-access warehouse with concrete structure and steel roof truss

Fire Rating

Class C-II

Parking Space

59 car parking spaces and 10 truck parking spaces

Loading Bay

172 Loading Bay

Loading Platform

1.3m raised platform with hydraulic dock levelers

Clear Height

9m Clear Height

Floor Loading

1F : 3T/sqm ; 2F : 2T/sqm

Floor Finish

Dust-free abrasion resistance flooring

Available Date

Completed in 2023 Q1

Class C ll Fire-Safety Grade

All buildings are fully equipped with automatic sprinkler, fire alarm systems, and both indoor and outdoor hydrant systems

Lighting Features

Facility Sorting Area : 250 lux
Facility Storage Area : 200 lux

The Line between Disorder and Order Lies in Logistics