Forest Xi’an ETDZ Logistics Park

西安1.jpg

Prime, Established Logistics Location

Conveniently located in Xi’an Economic & Technological Development Zone in Weiyang District, adjacent the airport expressways and it greatly improves the efficiency of urban logistics and transportation.

Excellent Specifications

The property was built to a very high specification with 4 premium-grade logistics facilities and intelligent management systems. It provides 9m clear heights and 51 loading bay, which allows for high operational efficiency.

STRATEGIC LOCATION

Forest Xi’an ETDZ Logistics Park
  • 21.5 km to Xi’an Xianyang International Airport

  • 1.8 km to Airport Expressway Entrance

  • 3 km to Xi’an North Station

  • 7.2 km to Xi’an Downtown

  • 18 km to Xi’an Railway Station

xian.jpg

PARTICULARS

  • 西安2.jpg
  • 2020
    Q3

    Completed in

  • 100,283
    sqm

    Total leasable area

  • 2,900
    sqm
    -5,640
    sqm

    Offer unit size ranging from

EXCELLENT SPECIFICATIONS

24/7 operations, Parking and Truck Parking, CCTV surveillance, ESFR sprinklers, Security

Building Structure

Double-storey ramp-access logistics facilities with concrete structure and steel roof truss

Fire Rating

Class C-II

Parking Space

327 vehicle parking spaces and 260 bicycle parking spaces

Loading Bay

51 Loading Bay

Loading Platform

1.3m raised platform with hydraulic dock levelers

Clear Height

9m Clear Height

Floor Loading

1F : 3T/sqm ; 2F : 2T/sqm

Floor Finish

Dust-free abrasion resistance flooring

Available Date

Expected in Q3 2020

Class C ll Fire-Safety Grade

All buildings are fully equipped with automatic sprinkler, fire alarm systems, and both indoor and outdoor hydrant systems

Lighting Features

Facility Sorting Area : 250 lux
Facility Storage Area : 200 lux
c1_img.png
c1_bg01.svg

Building Structure

Double-storey ramp-access logistics facilities with concrete structure and steel roof truss

Fire Rating

Class C-II

Parking Space

327 vehicle parking spaces and 260 bicycle parking spaces

Loading Bay

51 Loading Bay

Loading Platform

1.3m raised platform with hydraulic dock levelers

Clear Height

9m Clear Height

Floor Loading

1F : 3T/sqm ; 2F : 2T/sqm

Floor Finish

Dust-free abrasion resistance flooring

Available Date

Expected in Q3 2020

Class C ll Fire-Safety Grade

All buildings are fully equipped with automatic sprinkler, fire alarm systems, and both indoor and outdoor hydrant systems

Lighting Features

Facility Sorting Area : 250 lux
Facility Storage Area : 200 lux

The Line between Disorder and Order Lies in Logistics